Wednesday, January 23, 2013

Kitchen

The construction is almost finished, oh so close to moving in!

My shiny new microwave! I was going to get a toaster oven too since I won't have an actual oven but decided to put it off and try to get along with just a toaster to see if I really miss it. So far I haven't!

From 'under construction' to 'completed'! It seems I don't have any in between pics.

It took some figuring to get the plumbing, wiring, and propane fitted with the drawers and stuff, but worked out in the end. The 2 burner propane cook top fits perfectly above the refrigerator. The fridge does stick out a bit because of the wheel well, but it hasn't bothered me. It's about 4 cubit feet, I think, and has more than enough room for my purposes. The freezer section is tiny, but I have access to a chest freezer on the property so it works out.

The only thing I have yet to do is add spice racks.

Up next: Loft Ceiling (this was a huge pain!)